Hull Royal Infirmary – Changing Places Toilets

Project Brief - Standard Accessible toilets do not meet the needs of all people with a disability. People with profound and multiple learning disabilities, as well as people with other physical disabilities such as spinal injuries, muscular dystrophy and multiple sclerosis often need extra equipment and space to allow them to use toilets safely and comfortably.

  • Removal of 2 no cleaners stores
  • New hygienic cladded wall coverings
  • New MF ceilings
  • New mechanical and electrical installations
  • Installation of a tracked ceiling hoist system and height adjustable adult sized changing bed
  • Creating space for a disabled person and up to 2 carers with toilet with room either side
  • Installation of a screen to allow privacy
  • Installation of new non slip flooring
  • Addition of a male toilet and associated cubicle and sanitary ware

Hull Royal Infirmary – Emergency Care – Minors - Reception

Project Brief – After the installation of a new dedicated Emergency Care entrance and reception – the previous Emergency Care Department Reception required urgent modifications. In only a 4 day shutdown window ZDG were tasked with closing the area and competing urgent refurbishment works

  • Installation of an extended Nurse Streaming Area – inc structural alterations, new electrical installations and work area
  • New Decoration throughout
  • New Flooring
  • New Door sets
  • Alterations and modifications to the existing reception area

Diana Princess of Wales Hospital, Grimsby- Junior Drs Mess

Project Brief – Refurbishment to an existing junior Drs mess to provide an modern, clean, dedicated space for rest and recuperation.

  • New Mechanical and Electrical Installations
  • Isolated Suspended Ceiling replacements
  • Formation of new locker room and kitchenette
  • New Flooring throughout
  • Fire compartmentation works
  • Installation of new door sets
  • New decoration throughout

Hull Royal Infirmary – SACU

Project Brief – Creation of 2 new consulting rooms and 2 new treatment rooms in the Special Ambulatory Care Unit.

  • Internal demolitions – whilst remaining live for trust use
  • Mechanical and Electrical Isolations and new installations
  • Formation of new stud partitions and door openings
  • New Plastered and pre finish boarded walls
  • New Decoration
  • New Flooring
  • New Door sets
  • Installation of new IPS units
  • Alterations and modifications to the existing reception area
  • New suspended ceilings

Hull Royal Infirmary – RTEC

Project Brief - To enable the installation of a new ward the existing training and seminar rooms needed relocating. A staff area in the existing MRI was identified and ZDG were tasked with installing a new training and seminar room with staff kitchenette and staff WC.

  • New Mechanical and Electrical Installations
  • New Air conditioning and heating systems
  • Internal demolitions and alterations
  • Installation of a new dedicated external access and controlled door set
  • New Drainage connections for the new WC
  • New Kitchenette
  • New WC room and associated sanitary ware
  • New flooring
  • New Decoration throughout

Scunthorpe General Hospital – Emergency Care – Minors - Reception

Project Brief – After the installation of a new dedicated Emergency Care entrance and reception – the previous Emergency Care Department Reception required urgent modifications. In only a 4 day shutdown window ZDG were tasked with closing the area and competing urgent refurbishment works.

  • Temporary screening to enable works in a live emergency department
  • Installation of a new stud partition with hygenic cladding and lead lined curtain
  • Installation of temporary plastic curtains to separate Urgent Emergency Care Bays
  • Installation of new glazed sliding door sets